Course detail
Quality Management Systems
FAST-CW012Acad. year: 2018/2019
The principles of the two most significant quality management philosophies, these being Total Quality Management (TQM) and reengineering. The subject focuses mainly on the first part in greater detail – the implementation of a quality system and its development in TQM. It also deals with the relationship of TQM to other systems, such as the occupational safety system and the environmental system. Students are also acquainted with the basic civil engineering quality manual, with the personnel training system and the certification system.
Language of instruction
Number of ECTS credits
Mode of study
Guarantor
Department
Learning outcomes of the course unit
- principles and structure of quality management systems according to the requirements of ISO 9001,
- documentation of quality management systems necessary for companies and for construction execution,
- principles of internal auditing of the quality management system according to ISO 19011,
- principles of Total Quality Management methods and the KAIZEN system,
- principles of the reengineering method,
- the EFQM model of excellence,
- integrated management system of applications for engineering companies and construction execution.
Prerequisites
Co-requisites
Planned learning activities and teaching methods
Assesment methods and criteria linked to learning outcomes
Course curriculum
2. Quality management system (QMS) according to the ČSN EN ISO 9001:2009 standard for the construction of buildings and other civil engineering works. Characteristics. Implementation procedure.
3. Structure of standards. Structure and contents of the QMS documentation for building companies and construction execution – quality manual.
4. Responsibility of company management when introducing a QMS. Inspection and audit of QMS.
5. Management of resources, preparedness through qualifications, education plan and internal personnel training.
6. Product realization – construction execution. Review of contractual requirements. Selection and evaluation of suppliers and building contractors. Measurement devices and their calibration. SW for quality control.
7. QMS documentation – quality plan, inspection and testing plan, technical regulations , inspection and testing procedures. Site diary.
8. Quality monitoring at construction sites, quality records. Storage and warehouse quality requirements.
9. Construction efficiency, QMS audit, safety system audit, supervisor assessment (TDI).
10. Corrective and preventive measures. Elimination of deficiencies. Costs and quality. QMS certification.
11. Higher forms of quality management – KMJ (TQM, Total Quality Management). Characteristic features and factors. EFQM Model.
12. Reengineering – characteristics, changes, contractors, application within a company.
13. Integrated Management System (IMS) in a building company. Evaluation of construction execution from the perspective of quality, environment and occupational safety.
Work placements
Aims
Specification of controlled education, way of implementation and compensation for absences
Recommended optional programme components
Prerequisites and corequisites
Basic literature
Recommended reading
Classification of course in study plans
Type of course unit
Lecture
Teacher / Lecturer
Syllabus
2. Quality management system (QMS) according to the ČSN EN ISO 9001:2009 standard for the construction of buildings and other civil engineering works. Characteristics. Implementation procedure.
3. Structure of standards. Structure and contents of the QMS documentation for building companies and construction execution – quality manual.
4. Responsibility of company management when introducing a QMS. Inspection and audit of QMS.
5. Management of resources, preparedness through qualifications, education plan and internal personnel training.
6. Product realization – construction execution. Review of contractual requirements. Selection and evaluation of suppliers and building contractors. Measurement devices and their calibration. SW for quality control.
7. QMS documentation – quality plan, inspection and testing plan, technical regulations , inspection and testing procedures. Site diary.
8. Quality monitoring at construction sites, quality records. Storage and warehouse quality requirements.
9. Construction efficiency, QMS audit, safety system audit, supervisor assessment (TDI).
10. Corrective and preventive measures. Elimination of deficiencies. Costs and quality. QMS certification.
11. Higher forms of quality management – KMJ (TQM, Total Quality Management). Characteristic features and factors. EFQM Model.
12. Reengineering – characteristics, changes, contractors, application within a company.
13. Integrated Management System (IMS) in a building company. Evaluation of construction execution from the perspective of quality, environment and occupational safety.
Exercise
Teacher / Lecturer
Syllabus
2. Management of documents and records
3. Organizational rules in an engineering company, competencies and rights of employees
4. Quality policy
5. Proposal of quality goals for an engineering company and its individual parts
6. Quality plan for construction execution – drafting a proposal for a building contractor
7. Inspection and test plan for a selected construction process
8. Selection and evaluation of suppliers for a building contractor
9. Internal audit of a the quality management system according to the ČSN ISO 9001:2009 and ČSN ISO 19011.2012 standards
10. Corrective measures for non-compliance
11. Proposal of preventive measures for a building contractor
12. Application of the EFQM model in an engineering company
13. Evaluation of the assignment and granting of credit