Course detail

Ponds and purpose reservoirs

FAST-BS053Acad. year: 2017/2018

Introduction, definitions, history of the pond construction in CR
Categorization and function, research, selection of locality for small water reservoir
Water management of small water reservoirs, water losses, physical, chemical and biological processes
Pond dams, outlets, extractions, safety spillways, pond bottom, littoral zone, reservoir surrounding
Fish breeding ponds, water supply, industrial and irrigation reservoirs,
Polders, Erosion control reservoirs, rain water reservoirs, etc.
Operation and service regulations, mud removal, reservoirs restoration
Reconstruction and updating of small water reservoirs, faults of the pond dams, mistakes in ponds designing,
course of construction.

Language of instruction

Czech

Number of ECTS credits

6

Mode of study

Not applicable.

Department

Institute of Landscape Water Management (VHK)

Learning outcomes of the course unit

Student gains overview of ponds and small water reservoirs, knowledge of directives, ability of designing ponds, knowledge of construction principles in the process of designing.

Prerequisites

Knowledge of hydraulics and water management solution of reservoirs including transformation function.

Co-requisites

Not applicable.

Planned learning activities and teaching methods

Not applicable.

Assesment methods and criteria linked to learning outcomes

Not applicable.

Course curriculum

1. Introduction to the topic, history and purpose of ponds and small reservoirs, ecological and economical benefits
2. Location of the reservior, design fundamentals, rules and specifications,
3. Water management solution of small water reservoirs
4. Layout and technical solution of small water reservoirs
5. Dams - types, construction principles
6. Outflow facilities - design, types, construction principles
7. Safety spillways - design, types, construction principles
8. Withdrawal structures, special objects
9. Regulation of river channel under the reservoir, bottom arrangement and finishing of reservoir surrounding
10. Errors in dams and objects design, defects and failures
11. Fundaments for design, valid regulations, surveys
12. Operation and service regulations of small water reservoirs
13. Reconstruction of small water reservoirs, mud removal, faults of the pond dams, course of construction.

Work placements

Not applicable.

Aims

Overview of ponds and small water reservoirs subject, knowledge of directives, the ability of designing ponds, knowledge of construction principles in the process of designing.

Specification of controlled education, way of implementation and compensation for absences

Extent and forms are specified by guarantor’s regulation updated for every academic year.

Recommended optional programme components

Not applicable.

Prerequisites and corequisites

Not applicable.

Basic literature

Not applicable.

Recommended reading

Not applicable.

Classification of course in study plans

  • Programme B-K-C-SI (N) Bachelor's

    branch V , 4. year of study, summer semester, elective

  • Programme B-P-E-SI (N) Bachelor's

    branch V , 4. year of study, summer semester, elective

  • Programme B-P-C-SI (N) Bachelor's

    branch V , 4. year of study, summer semester, elective

Type of course unit

 

Lecture

26 hours, optionally

Teacher / Lecturer

Exercise

39 hours, compulsory

Teacher / Lecturer