Course detail

Railway Stations and Junctions 2

FAST-NNB016Acad. year: 2023/2024

Passenger stations, types, technology, extent. Switch and track layout, equipment and efficiency. Railhead and through passenger stations.
Storage stations, technology, sets of tracks arrangement. Equipment of storage stations
Shunting yards, functions, position in railway network. Development of sorting technology. Set of reception sidings. Hump, technical equipment, sets of tracks design, longitudinal section of hump track, dynamic estimation. Set of sorting sidings. Set of departure sidings, tracks for thoroughgoing trains.
Depots, running shed. Technology, the arrangement of trackage.
Railway siding (factory, industrial), set of tracks, connection to railway stations, interchange tracks
Railway junctions, passenger and goods traffic.

Language of instruction

Czech

Number of ECTS credits

5

Mode of study

Not applicable.

Department

Institute of Railway Structures and Constructions (ZEL)

Entry knowledge

Design of railway stops, goods points and operation control points, especially railway stations

Rules for evaluation and completion of the course

Extent and forms are specified by guarantor’s regulation updated for every academic year.

Aims

The objective of the subject is to introduce students to the problems of railway junctions, passenger and goods traffic in them and to practise acquires knowledge and skills.
A student acquires skills in problems of railway junctions, passenger and goods traffic.

Study aids

Not applicable.

Prerequisites and corequisites

Not applicable.

Basic literature

Majerčák, J. a kol. Železničná dopravná prevádzka, Technológia železničných staníc, EDIS, 2008, ISBN 978-80-8070-887-0 (SK)

Gombitová, J., Projektovanie, stavba a rekonštrukcia železničných staníc I, EDIS, 2007, ISBN 978-80-8070-755-2

(SK)

Recommended reading

Not applicable.

Classification of course in study plans

  • Programme NPC-SIK Master's, 2. year of study, winter semester, compulsory-optional

Type of course unit

 

Lecture

26 hours, optionally

Teacher / Lecturer

Syllabus

1. Shunting yards, functions, position in railway network. Development of sorting technology. 2. Set of reception sidings. Set of sorting sidings. Set of departure sidings, tracks for thoroughgoing trains. 3. Hump, technical equipment.Sets of tracks design, longitudinal section of hump track, dynamic estimation. 4. Passenger stations, types, technology, extent. Switch and track layout, equipment and efficiency. Railhead and through passenger stations. 5. Storage stations, technology, sets of tracks arrangement. Equipment of storage stations. 6. Depots, running shed. Technology, the arrangement of trackage. 7.–8. Railway siding (factory, industrial), set of tracks, connection to railway stations, interchange tracks. 9.–10. Railway junctions, passenger and goods traffic.

Exercise

13 hours, compulsory

Teacher / Lecturer

Syllabus

1. Specifying of the project, guidelines to draw up. 2. Design of hump height. 3. Design of turnout assembly, sets of tracks. 4. Design of longitudinal profile. 5. Dynamic evaluation of hump. 6. Format and content of drawings – Setting out drawing, longitudinal profile. 7. Consultation on the project. 8. Submitting of the projects, credit.