Course detail
Implementation of Investment Plans and Troubleshooting
FSI-KRZAcad. year: 2020/2021
The course is concerned with most activities related to the realization of investment plans through the practical examples.
Mainly the following topics are dealt with:
- proposal creation,
- contract,
- design of project,
- building process,
- assembly,
- complex tests,
- trial run,
- guaranty test,
- guaranty and after guaranty service.
Supervisor
Department
Learning outcomes of the course unit
Students will have a clear idea of all activities related to the realization of most of investment plans, from a supplier´s and investor´s points of view.
Prerequisites
Basic knowledge of procesního engineering, passed subject Thermal Processes.
Co-requisites
Not applicable.
Recommended optional programme components
Not applicable.
Recommended or required reading
Stephan P. (editor-in-chief), VDI-GVC: VDI Heat Atlas, 2nd. ed., Springer-Verlag, Berlin Heidelberg (2010).
Stehlík, P.: Integrace procesů a její význam pro redukci spotřeby energie a emisí., nakl. PI edice MAPRINT (1995).
Green, D.W., Southard, M.Z.: Perry's Chemical Engineer's Handbook, 9th Ed., McGraw-Hill (2018) (EN)
Planned learning activities and teaching methods
The course is taught through exercises which are focused on practical topics presented in lectures.
Assesment methods and criteria linked to learning outcomes
Course-unit credit requirements: active participation in seminars and obtaining in sum at least 10 points.
Language of instruction
Czech
Work placements
Not applicable.
Aims
The course objective is for students to realize practical use of their theoretical knowledge acquired from individual subjects of specialization.
Specification of controlled education, way of implementation and compensation for absences
Attendance at seminars is compulsory and checked.
Type of course unit
Exercise
26 hours, compulsory
Teacher / Lecturer
Syllabus
On lectures, students are introduced into most activities connected
with realization of investment plans.
This activities are mainly:
- proposal creation (including technical,
economic and business part),
- contract,
- design of project,
- building process,
- assembly,
- complex tests,
- trial run,
- guaranty test,
- guaranty and after guaranty service.