Course detail

Project Management of Building Constructions 2

FAST-NVA042Acad. year: 2020/2021

In the subject students will deepen and diversify their knowledge from the subject Project Management of Building Constructions 1. Attention is focused on construction projects from the aspect of buildings contractors. Part of the education is construction and technological preparation dealing with construction process and methods of construction. It is solved the flow method and associated balancing and linking of particular flows. Part of the education it is a proposal of construction site. With the building realization it is connected project controlling, assurance of quality, safety and health protection, protection of environment and recycling of building materials. Students will become familiar with the software Contec.

Language of instruction

Czech

Number of ECTS credits

5

Mode of study

Not applicable.

Department

Institute of Structural Economics and Management (EKR)

Learning outcomes of the course unit

Knowledge and skills from project management and to adopt concrete procedures and methods in construction project management.

Prerequisites

Managed basics of project management, phasing of projects associated with construction, content and methods of planning and realization of constructions, technology of building production and basics of network analysis.

Co-requisites

Not applicable.

Planned learning activities and teaching methods

Not applicable.

Assesment methods and criteria linked to learning outcomes

Not applicable.

Course curriculum

1. Project management, construction project management, types of activities and partners in construction proces.
2. Organization and definitions of construction firm, construction and technological preparation, production process management, fundamental terms.
3. Construction contract process as project, production process, methods of construction, flow method.
4. Parameters of flows, types of flows, flow period, schema of flow progress, flows balancing, jointing of particular flows.
5. Application Contec – construction and technological network chart, types of connections, basic functions, data, typical graphs, modelling and outputs.
6. Construction site – fundamental terms and requirements, division, operational part, objects for maintenance and reparations, site communications, stocks and stockpiles, water supply, drainage.
7. Construction site – electricity supply, operational protection and safety, production part, social and hygienic objects, lifting mechanisms, methodology of proposal.
8. Project controlling, analysis of achieved value of outputs and project costs development, system progress reporting.
9. Conception, assurance and control of quality.
10. Environmental protection, assurance and liquidation of wastes, recycling of materials.
11. Safety and health protection in construction proces.
12. Certification of project manager D degree according to the International Project Management Association principles.
13. Information sources about the construction and building industry.

Work placements

Not applicable.

Aims

To get further knowledge and skills from project management and to adopt concrete procedures and methods in construction project management. Necessary knowledge for planning and management of projects on the supplier’s side. Presumption for acquiring project manager certification in Czech Republic according to IPMA policy for level D „Certified Project Management Associate".

Specification of controlled education, way of implementation and compensation for absences

Extent and forms are specified by guarantor’s regulation updated for every academic year.

Recommended optional programme components

Not applicable.

Prerequisites and corequisites

Not applicable.

Basic literature

Not applicable.

Recommended reading

Not applicable.

Classification of course in study plans

  • Programme NPC-SIE Master's, 1. year of study, summer semester, compulsory

Type of course unit

 

Lecture

26 hours, optionally

Teacher / Lecturer

Syllabus

1. Project management, construction project management, types of activities and partners in construction proces. 2. Organization and definitions of construction firm, construction and technological preparation, production process management, fundamental terms. 3. Construction contract process as project, production process, methods of construction, flow method. 4. Parameters of flows, types of flows, flow period, schema of flow progress, flows balancing, jointing of particular flows. 5. Application Contec – construction and technological network chart, types of connections, basic functions, data, typical graphs, modelling and outputs. 6. Construction site – fundamental terms and requirements, division, operational part, objects for maintenance and reparations, site communications, stocks and stockpiles, water supply, drainage. 7. Construction site – electricity supply, operational protection and safety, production part, social and hygienic objects, lifting mechanisms, methodology of proposal. 8. Project controlling, analysis of achieved value of outputs and project costs development, system progress reporting. 9. Conception, assurance and control of quality. 10. Environmental protection, assurance and liquidation of wastes, recycling of materials. 11. Safety and health protection in construction proces. 12. Certification of project manager D degree according to the International Project Management Association principles. 13. Information sources about the construction and building industry.

Exercise

26 hours, compulsory

Teacher / Lecturer

Syllabus

1. Program of teaching, instruction and guidance, requirements for award a credit. Sample examples for certification according to IPMA. 2. 1st task – Schedule contract as a basis for tendering procedure. 3. Correction and completion the 1st task. 4. 2nd task – Structural plan of contract and its cost valuation. 5. Correction and completion the 2nd task. 6. Balancing and linking the processes – instruction and processing of examples. 7. 3rd task – Timetable of contract realization in the form of spatio-temporal graph. 8. Continuation the 3rd task - Schedule of material resources deployment, cost plan, financial order of the contract. 9. Correction and completion the 3rd task. 10. 4th task - Proposal of the building operation. 11. Correction and completion the 4th task. 12. Credit test. 13. Submission of all processed documents in a folder. Credit.