Course detail
Water Tanks and Pumping Stations
FAST-BP052Acad. year: 2019/2020
Design the elevation and volume of water storage reservoirs, equipment fitting and storage chambers, types of water tanks, construction methods of water tanks, technical autit of water tanks.
Basic types of pumps, ways of involving pumps, pumps with variable speed, technological and service equipment of pumping stations, construction of pumping stations, cavitation, watre hammer protection , booster stations, technical audit of pumping stations.
Supervisor
Department
Institute of Municipal Water Management (VHO)
Learning outcomes of the course unit
Ability to design water storege tanks and water supply pumping stations, the ability of communication with the specialist - mechanical engineer in solving the technology of water supply pumping stations.
Prerequisites
Hydraulic, Municipal Technical Equipment Networks
Co-requisites
Not applicable.
Recommended optional programme components
Not applicable.
Recommended or required reading
Not applicable.
Planned learning activities and teaching methods
Not applicable.
Assesment methods and criteria linked to learning outcomes
Not applicable.
Language of instruction
Czech
Work placements
Not applicable.
Course curriculum
1. Physical properties of pumped media, hydraulic of pipe fittings, local head losses
losses
2. Types of water storage tanks, storage design, elevation location of the tanks
3. Equipment of the water tank valve chambers, operation of tanks.
4. Building design and construction of water storage tanks, technical audit of water tanks.
5. Excursion to the selected water storage tank
6. Centrifugal types of pumps, the basic pumps curves
7. The proposal of basic pumping system - pumps, transmission main, water storage tank
8. Suction side of the pump, energy usage, efficiency and optimization of pumping stations
pump operation
9. Booster pumping stations, pumps with variable speed
10. Water hammer, protection against the water hammer, cavitation
11. Pressure reducing and control valves, technical audit of pumping stations.
12. Excursion to the selected pumping station
13. Producers of the pumps, databases of the pumps
Aims
Extend a basic knowledge of water tanks and pumping stations that received the student in subject BP03 Water supply. The goal is to enable graduate students to solve a simple case of a water tanks and pumping stations design, the ability to work with specialists in dealing with complex issues.
Specification of controlled education, way of implementation and compensation for absences
Extent and forms are specified by guarantor’s regulation updated for every academic year.
Classification of course in study plans
- Programme B-P-C-SI (N) Bachelor's
branch V , 4. year of study, winter semester, 5 credits, elective
- Programme B-K-C-SI (N) Bachelor's
branch V , 4. year of study, winter semester, 5 credits, elective
- Programme B-P-E-SI (N) Bachelor's
branch V , 4. year of study, winter semester, 5 credits, elective