Course detail

Technology of constructions II

FAST-BW04Acad. year: 2013/2014

The subject links to the Technology of constructions I. and it includes area of building processes linked with erection of constructions, inner and finishing works. The main part is reserved for crafts works with high time and coordination demands, s.c. associated building operations (PSV). The importance of knowledge of these processes is given by the fact that they represent more than a half of the labour requirements and financial costs needed for the construction realisation in the civil engineering area. They also significantly affect the function, useful value and quality of the construction. The characteristic feature of these processes is their dispersion into more than thirty crafts differing in type. They are an integral par of the construction process and they require a very good coordination and control activity. This is not possible without knowledge of their contents, technology requirements and links.

Language of instruction

Czech

Number of ECTS credits

5

Mode of study

Not applicable.

Department

Institute of Technology, Mechanisation and Construction Management (TST)

Learning outcomes of the course unit

Students will acquire knowledge about the preparation and execution of selected partial construction processes. They will be able to work out a project documentation of the basic construction processes in the field of building constructions. The students will learn about construction preparedness of the selected partial construction processes. They will be able to solve these partial construction processes from the spatial, technological and time points of view. They will learn about the machinery equipment of the processes and the basic occupational safety rules.

Prerequisites

Knowledge of building design principles.

Co-requisites

Extending knowledge in field of building construction designing.

Planned learning activities and teaching methods

One of the teaching methods is frequent field trips to finished constructions. The controlled outcomes consist of elaborated technological regulations for individual partial construction processes.

Assesment methods and criteria linked to learning outcomes

The conditions for course completion are: obligatory seminar attendance, admission of the elaborated partial construction processes, and passing the exam.

Course curriculum

1. Assembly processes. Principles of production, transportation and storing of semi-products. Assembly of buildings of reinforced concrete semi-products. Readiness of the site for assembly. Assembly procedures, cranes, optimisation of their selection. Quality requirements for assembled structures.
2. Assembly of steel structures. Production of structural elements, principles of haulage and storage. Readiness of the site for assembly, pre-assembly areas. Optimisation of assembly methods and procedures. Requirements for quality and accuracy of assembled structures.
3. Introduction into the sphere of inner and finishing processes, their analysis, demands, technology level. Sequence of individual processes, links, necessary technology breaks.
4. Principles of partitions execution – masonry, made of glass blocks and assembled of segments and skeletal. Readiness of construction, flow-charts, tests, quality control.
5. Installation processes. Establishment of inner sewage system. Water and central heating distributions. Installation of inner gas duct and air handling distributions. Systems, material options, readiness of construction, assembly processes, principles of connecting.
6. Execution of building water, heat, noise, vibration insulations and insulations against chemical impacts. Flow-charts, readiness of constructions, links, quality control, tests.
7. Assemblies of opening fillings – windows, door panels, locksmith product packing, built-in furniture panels etc. Readiness of construction, working procedures, types of anchoring. Quality requirements.
8. Building structure surface treatment – interior plasterwork and external coatings, types, flow-charts, readiness of the background, technology breaks, flatness requirements, quality inspection.
9. Technology of contact warm padding building claddings, systems, flow-charts. Background preparation, principles of execution of thin-coat reinforcement plasters. Quality conditions.
10. Execution of interior and external linings, systems, technology procedures, requirements for construction readiness. Contact and grid linings. Quality requirements, quality inspection method.
11. Establishment of ceiling soffits. Systems, readiness of the base, technology procedures. Time demand. Flatness requirements and their inspection.
12.Laying of floors and paving. Types, material options. Working procedures, requirements for technology breaks. Quality requirements and their inspection.
13. Paintings and wall, timber and steel structure coatings. Types of painting and coating materials, their classification and applicability. Requirements for the base, application method, quality inspection.
Completing of craft works, installation of fittings, fixing technology. Test and inspection reports, necessary inspections for the final building acceptance.

Work placements

Not applicable.

Aims

·To teach the student to apply individual processes of carcass substructure and superstructure, installation process and finishing works in practice and to deal with particular problems at individual examples.

Specification of controlled education, way of implementation and compensation for absences

Extent and forms are specified by guarantor’s regulation updated for every academic year.

Recommended optional programme components

Not applicable.

Prerequisites and corequisites

Not applicable.

Basic literature

Prof. Kočí a kol.: Technologie pozemních staveb I.. VUT Brno, 0.
Prof. Musil, Ing. Henková, Ing. Nováková: Technologie pozemních staveb - návody do cvičení. 0.
Prof. Musil, Ing.Tuza: Ateliérová tvorba - stavebně technologické projekty. 0.
Juříček I. a kol.: Technológia pozemných stavieb 1. ALFA Bratislava, 1992.
Stein, B.: Building technology, 2nd edition. Wiley, 1997.
Spence, W. P.: Construction materials, Methods and techniques. Delmar ITP, 1998.
Kočí B. a kol.: Technologie pozemních staveb I. - základní stavební procesy. VUT Brno, 1999.
Kočí: Technologie domovních instalací. VUT Brno, 2000.
Zapletal I., Musil F. a kol.: Technologie staveb – Dokončovací procesy. STU Bratislava, 2002.

Recommended reading

Firemní literatura, odborné časopisy. 0.
Doc. Musil a kol.: Provádění pozemních staveb - Procesy vnitřní a dokončovací I. a II.. SNTL Praha, 1988.

Classification of course in study plans

  • Programme B-P-C-ST Bachelor's

    branch S , 3. year of study, summer semester, compulsory

  • Programme B-P-E-SI Bachelor's

    branch S , 3. year of study, summer semester, compulsory

  • Programme B-K-C-SI Bachelor's

    branch S , 3. year of study, summer semester, compulsory

  • Programme B-P-C-SI Bachelor's

    branch S , 3. year of study, summer semester, compulsory

Type of course unit

 

Lecture

26 hours, optionally

Teacher / Lecturer

Syllabus

1. Assembly processes. Principles of production, transportation and storing of semi-products. Assembly of buildings of reinforced concrete semi-products. Readiness of the site for assembly. Assembly procedures, cranes, optimisation of their selection. Quality requirements for assembled structures.
2. Assembly of steel structures. Production of structural elements, principles of haulage and storage. Readiness of the site for assembly, pre-assembly areas. Optimisation of assembly methods and procedures. Requirements for quality and accuracy of assembled structures.
3. Introduction into the sphere of inner and finishing processes, their analysis, demands, technology level. Sequence of individual processes, links, necessary technology breaks.
4. Principles of partitions execution – masonry, made of glass blocks and assembled of segments and skeletal. Readiness of construction, flow-charts, tests, quality control.
5. Installation processes. Establishment of inner sewage system. Water and central heating distributions. Installation of inner gas duct and air handling distributions. Systems, material options, readiness of construction, assembly processes, principles of connecting.
6. Execution of building water, heat, noise, vibration insulations and insulations against chemical impacts. Flow-charts, readiness of constructions, links, quality control, tests.
7. Assemblies of opening fillings – windows, door panels, locksmith product packing, built-in furniture panels etc. Readiness of construction, working procedures, types of anchoring. Quality requirements.
8. Building structure surface treatment – interior plasterwork and external coatings, types, flow-charts, readiness of the background, technology breaks, flatness requirements, quality inspection.
9. Technology of contact warm padding building claddings, systems, flow-charts. Background preparation, principles of execution of thin-coat reinforcement plasters. Quality conditions.
10. Execution of interior and external linings, systems, technology procedures, requirements for construction readiness. Contact and grid linings. Quality requirements, quality inspection method.
11. Establishment of ceiling soffits. Systems, readiness of the base, technology procedures. Time demand. Flatness requirements and their inspection.
12.Laying of floors and paving. Types, material options. Working procedures, requirements for technology breaks. Quality requirements and their inspection.
13. Paintings and wall, timber and steel structure coatings. Types of painting and coating materials, their classification and applicability. Requirements for the base, application method, quality inspection.
Completing of craft works, installation of fittings, fixing technology. Test and inspection reports, necessary inspections for the final building acceptance.

Exercise

26 hours, compulsory

Teacher / Lecturer

Syllabus

1. Reinforced concrete frame installation
Structure design and frame elements listing, installation procedure, selection of an assembly crane, work aids, work time course.
Scheme of the crane locality on the construction site, crane capacity diagram
2. Interior installation distribution
Technology regulation for interior installation distribution placing (water, canalization, electricity). Construction preparedness, material selection, execution procedure.
3. Interior plastering placing
Construction preparedness, selected materials, work crew composition, mechanisms and work tools. Installation procedure, time plan for interior plastering placing on the selected construction.
4. Floor laying
Floor surface selection in one floor, construction preparedness, materials listing, work tools and aids.
Work procedure order.
5. Assignments assessment, designed solutions defense, credit.