Detail publikace

BIM-based timber structures refurbishment of the immovable heritage listed buildings

HENEK, V. VENKRBEC, V.

Originální název

BIM-based timber structures refurbishment of the immovable heritage listed buildings

Typ

článek ve sborníku ve WoS nebo Scopus

Jazyk

angličtina

Originální abstrakt

The use of Building information model (BIM) design tools is no longer an exception, but a common issue. When designing new buildings or complex renovations using BIM, the benefits have already been repeatedly published. The essence of BIM is to create a multi-dimensional geometric model of a planned building electronically on a computer, supplemented with the necessary information in advance of the construction process. Refurbishment is a specific process that combines both - new structures and demolished structures, or structures that need to be dismantled, repaired, and then returned to the original position. Often it can be historically valuable part of the building. BIM-based repairs and refurbishments of the constructions, especially complicated repairs of the structures of roof trusses of immovable heritage listed buildings, have not yet been credibly presented. However, the use of BIM tools may be advantageous in this area, because user can quickly response to the necessary changes that may be needed during refurbishments, but also in connection with the quick assessment and cost estimation of any unexpected additional works. The paper deals with the use of BIM in the field of repairs and refurbishment of the buildings in general. The emphasis on monumentally protected elements was priority. Advantage of the proposal research is demonstrated on case study of the refurbishment of the immovable heritage listed truss roof. According to this study, this construction was realized in the Czech Republic. Case study consists of 3D modelled truss parts and the connected technological workflow base. The project work was carried out in one common model environment.

Klíčová slova

BIM; 3D; heritage listed buildings; immovable heritage; renovation; truss; workflow;

Autoři

HENEK, V.; VENKRBEC, V.

Vydáno

21. 12. 2017

Nakladatel

IOP Publishing

Místo

Prague

ISSN

1755-1307

Periodikum

IOP Conference Series: Earth and Environmental Science

Ročník

2017

Číslo

95

Stát

Spojené království Velké Británie a Severního Irska

Strany od

1

Strany do

9

Strany počet

9

URL

Plný text v Digitální knihovně

BibTex

@inproceedings{BUT138553,
  author="Vladan {Henek} and Václav {Venkrbec}",
  title="BIM-based timber structures refurbishment of the immovable heritage listed buildings",
  booktitle="WMESS 2017 - Abstract collection book - World Multidisciplinary Earth Sciences Symposium. 11. - 15. september 2017, Prague, Czech Republic",
  year="2017",
  journal="IOP Conference Series: Earth and Environmental Science",
  volume="2017",
  number="95",
  pages="1--9",
  publisher="IOP Publishing",
  address="Prague",
  doi="10.1088/1755-1315/95/6/062002",
  issn="1755-1307",
  url="http://iopscience.iop.org/article/10.1088/1755-1315/95/6/062002"
}