Course detail

Selected sections of building technology processes - GI

FAST-CW55Acad. year: 2020/2021

The course covers study of selected construction processes related with realization of underground constructions, building and engineering constructions. Technology, space and time structure, requirements on the site preparation, principles of execution of construction process as well as quality requirements are explained.
The substantial part of the course is aimed at execution of underground structures where technologies of special foundation of constructions for execution of excavated underground structures are given, together with overview of classical and modern tunnelling systems and arrangements, machines and equipment for underground constructions.

Language of instruction

Czech

Number of ECTS credits

3

Department

Institute of Technology, Mechanisation and Construction Management (TST)

Learning outcomes of the course unit

The students will master the objective of the Selected Issues of Technology of Construction Processes course, they acquire knowledge of the realization of the selected building processes of underground, building and engineering constructions. This knowledge enables subsequent study of the time planning, modelling, optimisation and rational management of site operations.

Prerequisites

The students should have mastered the basic knowledge of geology, geo-mechanics, construction foundation, planning of underground and transport constructions.

Co-requisites

Not applicable.

Planned learning activities and teaching methods

Not applicable.

Assesment methods and criteria linked to learning outcomes

Not applicable.

Course curriculum

1. Introduction into the construction technology science. Analysis of construction processes, process plan.
2.Technology of special foundation of constructions related with excavated underground constructions.
3.Casing structures (Stent walls, pile and underground walls), injecting and anchoring of rock surrounding.
4.Nomenclature of building constructions. Tunnelling systems and assemblies.
5.Classic assemblies. Drilling and blasting. Ring method.
6.New Austrian tunnelling method (NATM). Peripheral notch method. Micro-tunnelling.
7.Machines and equipment for underground constructions (cut, excavated, combined, micro-tunnelled).
8.Earthworks – filling structures (dam material, construction procedures, compacting means). Underground walls (application, construction procedure).
9.Additional pressure grouting and reinforcement injecting. Trenchless technologies – cutting of tunnels (drifts), shielding, pushing, micro-tunnelling, controlled drilling.
10.Principles of making the walling of bricks, formed bricks and stone. Module, technology and quality requirements. Quality control.
11.Manufacture of steel and timber structures, welding of steel structures, connecting materials for steel and timber structures, transportation to the site.
12.Main ways of the assembly of steel and timber structures.
13.Execution of road bearing structure and pavement cover.

Work placements

Not applicable.

Aims

To acquire basic knowledge of realization of selected construction processes of underground, building and engineering constructions. To enable subsequent study of time scheduling, modelling, optimisation and rational management of site operations.

Specification of controlled education, way of implementation and compensation for absences

Extent and forms are specified by guarantor’s regulation updated for every academic year.

Recommended optional programme components

Not applicable.

Prerequisites and corequisites

Not applicable.

Basic literature

Hobst,L.,Hobst,O: Technologie sypaných hrází. SNTL Praha, ALFA Bratislava, 1984.
Klepsatel,F.,Kusý,P.,Mařík,L.: Výstavba tunelů ve skalních horninách. JAGA Bratislava, 2003.
Lízal,P. a kol.: Technologie stavebních procesů pozemních staveb - úvod do technologie. Cerm, s.r.o. Brno, 2003.
Klepsatel,F.,Kusý,P.,Mařík,L.: Městské podzemní stavby. JAGA Bratislava, 2005.
Kudrna,J.: Technologie pozemních komunikací. VUT v Brně, FAST, 2007.

Recommended reading

Kolymbas,D.: Geotechnik-Tunnelbau und Tunnelmechanik. Springer, 1998.
Girmscheid,G.: Leistungsermittlung für Baumaschinen und Bauprozesse. Springer, 2002.

Type of course unit

 

Lecture

26 hours, optionally

Teacher / Lecturer

Syllabus

1. Introduction into the construction technology science. Analysis of construction processes, process plan. 2.Technology of special foundation of constructions related with excavated underground constructions. 3.Casing structures (Stent walls, pile and underground walls), injecting and anchoring of rock surrounding. 4.Nomenclature of building constructions. Tunnelling systems and assemblies. 5.Classic assemblies. Drilling and blasting. Ring method. 6.New Austrian tunnelling method (NATM). Peripheral notch method. Micro-tunnelling. 7.Machines and equipment for underground constructions (cut, excavated, combined, micro-tunnelled). 8.Earthworks – filling structures (dam material, construction procedures, compacting means). Underground walls (application, construction procedure). 9.Additional pressure grouting and reinforcement injecting. Trenchless technologies – cutting of tunnels (drifts), shielding, pushing, micro-tunnelling, controlled drilling. 10.Principles of making the walling of bricks, formed bricks and stone. Module, technology and quality requirements. Quality control. 11.Manufacture of steel and timber structures, welding of steel structures, connecting materials for steel and timber structures, transportation to the site. 12.Main ways of the assembly of steel and timber structures. 13.Execution of road bearing structure and pavement cover.

Exercise

13 hours, compulsory

Teacher / Lecturer

Syllabus

Prefabricated ceiling structures, technological regulation Prefabricated ceiling structures, technological regulation - completion Building constructions – partition structures Building constructions – partition structures - completion Building constructions – tunnelling methods Building constructions – tunnelling methods – completion Special foundation engineering Consultation seminar Metal structures implementation Metal structures implementation – completion Masonry structures, technological regulation Masonry structures, technological regulation – completion Assessment of implemented tasks, defence of proposed designs, credit awarding