Project Sewerages and WWTP

FAST-BP007Acad. year: 2018/2019

The aim of the subject is to extend and practise theoretical knowledge and practical design proficiency that is obtained earlier in subjects “Sewerage” and “Wastewater treatment”. In the frame of the comprehensive project is solved urban runoff drainage and safe treatment of all types of wastewater in the real catchment area. Students propose a project documentation of sewerage network and wastewater treatment plant. Drawing documentation includes technical report and detailed hydrotechnic and technologic calculations. Students use computers and current software.

Language of instruction

Czech

Number of ECTS credits

3

Mode of study

Not applicable.

Department

Institute of Municipal Water Management (VHO)

Learning outcomes of the course unit

Project sewer system and wastewater treatment plants, calculation the amount of wastewater, design and dimensioning sewer system, drainage tracing, technology scheme of wastewater treatment plant, longitudinal profile of the main sewer, wastewater treatment plant scheme, technical report.

Prerequisites

Hydraulics, Hydrology, Engineering nets, Sewerage Systems, Chemistry and Water Technology, Treatment of waste water

Co-requisites

Not required.

Planned learning activities and teaching methods

Teaching methods depend on the type of course unit as specified in the article 7 of BUT Rules for Studies and Examinations.

Assesment methods and criteria linked to learning outcomes

Mandatory active participation in seminars at the seminars (only allowed two excused absence).
Submitting examples of exercises deadlines.

Course curriculum

Not applicable.

Work placements

Not applicable.

Aims

The basic conception solution and design of drainage urban areas and treatment of waste-water from urban areas.

Specification of controlled education, way of implementation and compensation for absences

Extent and forms are specified by guarantor’s regulation updated for every academic year.

Recommended optional programme components

The study of recommended websites of producers and suppliers of wastewater treatment plant and pipe materials.

Prerequisites and corequisites

Not applicable.

Basic literature

Not applicable.

Recommended reading

Not applicable.

Classification of course in study plans

  • Programme B-P-E-SI (N) Bachelor's

    branch V , 4. year of study, summer semester, compulsory

  • Programme B-K-C-SI (N) Bachelor's

    branch V , 4. year of study, summer semester, compulsory

  • Programme B-P-C-SI (N) Bachelor's

    branch V , 4. year of study, summer semester, compulsory

Type of course unit

 

Exercise

26 hours, compulsory

Teacher / Lecturer

Syllabus

1. Task a topology
2. Calculation of flow in the sewer and water inflow to the WWTP
3. Hydraulic analysis in sewerage - Hydro situation sewerage
4. Technological and height scheme of waste water treatment plants
5. Design objects of wastewater treatment plant
6. Longitudinal sections of the sewer systems
7. Typical cross-section of coordination networks, design of machinery wastewater treatment plant
8. Planned excursions, consultation
9. The detailed situation wastewater treatment facilities
10. Situation of the sewer network, Technical report
11. Credit