Branch Details

Management in the Building Industry

Original title in Czech: Management stavebnictvíFASTAbbreviation: MGSAcad. year: 2015/2016

Programme: Civil Engineering

Length of Study: 4 years

Accredited from: 25.10.2007Accredited until: 31.12.2014

Profile

PhD study of study branch Civil Engineering Management is focused on the scientific training, the methodology of the scientific work and on the development of knowledge in the area of the real investments, the project management, the space economics, the value analysis in construction, the quality management, the marketing management and the risk management. The scientific training of this study branch is based on the mastering of initial theoretical disciplines of the scientific base and theoretical disciplines of the appropriate orientation. The graduate of the PhD study of the study branch Civil Engineering Management is prepared for the asserting himself in the development and scientific activity in the area of appropriate orientation of the study branch and also for the solving of difficult and unusual problems connected with the cost management, the management of the time and the value of investment construction projects and globally with the structural firm's management.
The continuous and active scientific activity is also the supposition of the possible staying of graduates as academic employees at universities.

Guarantor

Issued topics of Doctoral Study Program

2. round (applications submitted from 09.11.2015 to 13.12.2015)

  1. Economic Risk Managment in Construction Project

    The objective of the doctoral thesis is to create the model of dependance of the economic efficiency of construction projects on risks connected with the construction investment. Within the doctoral thesis there will be identified relevant risk factors and defined selected criteria for the evaluation of the ecnomic efficiency of projects. In the frame of the elaboration of doctoral thesis there will be used scientific methods including analysis and mathematical simulation.

    Tutor: Hromádka Vít, doc. Ing., Ph.D.

  2. Enterprise performance management system in construction industry

    Student has to describe modern methods of enterprise performance measurement. The objective of thesis is to design the system of performance measurement in construction company using Key Performance Indicators. The aim of proposed system utilization is to ensure continuous performance improvement in the company.

    Tutor: Hanák Tomáš, doc. Ing., Ph.D.

  3. Management Accounting as a Tool for Effective Construction Company Management

    In the context of the thesis will be a model of management accounting that will be used for effective management of construction company created. Effective management of construction company is required in all business areas. In order to effectively manage the entity is required to obtain the necessary information. This information is brought together in the frame of management accounting.

    Tutor: Vítková Eva, Ing., Ph.D.

  4. Monte Carlo Simulation in Investment Decision Making

    Monte Carlo simulation extends investment modelling towards the possibility of interval estimation of input variables, e.g. in the form of probability distribution. The aim is to create a simulation model for the calculation of economic efficiency indicators of the investment project, to set an appropriate probability distribution of individual risk variables and subsequently verify the model by a case study.

    Tutor: Korytárová Jana, prof. Ing., Ph.D.

  5. The Determinants of Small Enterprises Development in Civil Engineering

    Dissertation thesis will deal with the research of determinants determining the development of small enterprises. Primary survey based on questionairing will be provided on representative sample of enterprises. Civil engineering sector will be selected for the research.

    Tutor: Koráb Vojtěch, prof. Ing., Dr., MBA

1. round (applications submitted from 23.06.2015 to 31.07.2015)

  1. Enterprise performance management system in construction industry

    Student has to describe modern methods of enterprise performance measurement. The objective of thesis is to design the system of performance measurement in construction company using Key Performance Indicators. The aim of proposed system utilization is to ensure continuous performance improvement in the company.

    Tutor: Hanák Tomáš, doc. Ing., Ph.D.

  2. Management Accounting as a Tool for Effective Construction Company Management

    In the context of the thesis will be a model of management accounting that will be used for effective management of construction company created. Effective management of construction company is required in all business areas. In order to effectively manage the entity is required to obtain the necessary information. This information is brought together in the frame of management accounting.

    Tutor: Vítková Eva, Ing., Ph.D.

  3. Management of Restoration of Standard Activitity of Building Enterprises Affected by Financial Crisis

    Apart from series of small building enterprises which had to finish their activity there has remained a particular amount of enterprises with the same area of business activities and a similar size. Management took some necessary and unavoidable measures in these enterprises which enabled him to manage the financial crisis (so-called the strategy for survival). Nowadays it is already apparent that the building market started to revive and it is necessary to create a suitable and methodical universal instruction for a successful reversion of these chosen subjects to the building market.

    Tutor: Puchýř Bohumil, doc. Ing., CSc.

  4. Mapping of innovation potential in the construction and building materials industry

    Mapping innovation potential in the construction and building materials industry in the country. Polling in selected enterprises and the use of statistical information aimed at non-technical and technical innovation. Both qualitative and quantitative aspects of the innovation process. Summary inovation index using input output analysis. Innovation potential in the EU countries.

    Tutor: Tichá Alena, doc. Ing., Ph.D.

  5. Model of Influence of Risk on Economic Efficiency of Construction Investments

    The objective of the doctoral thesis is to create the model of dependance of the economic efficiency of construction projects on risks connected with the construction investment. Within the doctoral thesis there will be identified relevant risk factors and defined selected criteria for the evaluation of the ecnomic efficiency of projects. In the frame of the elaboration of doctoral thesis there will be used scientific methods including analysis and mathematical simulation.

    Tutor: Hromádka Vít, doc. Ing., Ph.D.

  6. Modelling & Simulation of Risk Financing Major Investment Programmes and Government Activities

    In the dissertation the fundamental principles of financing major investment programmes and government activities will be described. The goal of the work will be the identification, analysis and evaluation of risks that may arise in the life cycle phases of investment projects, which constitute these activities. The purpose of this concept of risk analysis is to create a methodological basis for their management in order to increase the efficiency of the management of state assets in this field.

    Tutor: Korytárová Jana, prof. Ing., Ph.D.

  7. The Determinants of Small Enterprises Development in Civil Engineering

    Dissertation thesis will deal with the research of determinants determining the development of small enterprises. Primary survey based on questionairing will be provided on representative sample of enterprises. Civil engineering sector will be selected for the research.

    Tutor: Koráb Vojtěch, prof. Ing., Dr., MBA


Course structure diagram with ECTS credits

1. year of study, summer semester
AbbreviationTitleL.Cr.Com.Compl.Hr. rangeGr.Op.
DV01Doctoral seminar Ics4CompulsoryCrC1 - 39yes
DY02Foreign Language Tutoring of PhD Studentscs1CompulsoryCrC1 - 26yes
DA58Discrete Methods in Civil Engineering Ics4ElectiveCrP - 394250yes
DA61Numerical methods Ics4ElectiveCrP - 394250yes
DA62Probability and mathematical statisticscs4ElectiveCrP - 394250yes
DV73Spatial Economicscs8ElectiveExP - 394252yes
DV72Current Economic Theories and Economic Policycs8ElectiveExP - 394252yes
DV79cs8ElectiveExP - 394253yes
DV74Inovation managementcs8ElectiveExP - 394253yes
DV76Crisis Managementcs8ElectiveExP - 394253yes
DV75Company managementcs8ElectiveExP - 394253yes
DV80cs8ElectiveExP - 394253yes
2. year of study, winter semester
AbbreviationTitleL.Cr.Com.Compl.Hr. rangeGr.Op.
DV02Doctoral seminar IIcs8CompulsoryCrC1 - 78yes
DA65Time series analysiscs10ElectiveExP - 394251yes
DA67Applications of mathematical methods in economicscs10ElectiveExP - 394251yes
DA59Discrete Methods in Civil Engineering IIcs10ElectiveExP - 394251yes
DA63Numerical methods IIcs10ElectiveExP - 394251yes
DA66Numerical methods for the variational problemscs10ElectiveExP - 394251yes
DA64Models of regressioncs10ElectiveExP - 394251yes
DV77Investment Projects Managementcs8ElectiveExP - 394254yes
DV78Project Managementcs8ElectiveExP - 394254yes
ZQ61Forensic engineering - general metodologycs8ElectiveExP - 394254yes
2. year of study, summer semester
AbbreviationTitleL.Cr.Com.Compl.Hr. rangeGr.Op.
DY01English for the Doctoral Study Programmecs8CompulsoryExyes
DV03Doctoral seminar IIIcs8CompulsoryCrC1 - 78yes
3. year of study, winter semester
AbbreviationTitleL.Cr.Com.Compl.Hr. rangeGr.Op.
DV04Doctoral seminar IVcs8CompulsoryCrC1 - 78yes
3. year of study, summer semester
AbbreviationTitleL.Cr.Com.Compl.Hr. rangeGr.Op.
DV05Doctoral seminar Vcs14CompulsoryCrC1 - 78yes
4. year of study, winter semester
AbbreviationTitleL.Cr.Com.Compl.Hr. rangeGr.Op.
DV06Doctoral seminar VIcs14CompulsoryCrC1 - 78yes
4. year of study, summer semester
AbbreviationTitleL.Cr.Com.Compl.Hr. rangeGr.Op.
DV07Doctoral seminar VIIcs20CompulsoryCrC1 - 78yes
All the groups of optional courses
Gr. Courses
4250 DA58, DA61, DA62
4251 DA65, DA67, DA59, DA63, DA66, DA64
4252 DV73, DV72
4253 DV79, DV74, DV76, DV75, DV80
4254 DV77, DV78, ZQ61
4849